Full gut renovations built to current waterproofing standard. Most run $20,000 to $35,000. Smaller bathrooms start around $15,000.
A bathroom is the smallest room in the house and the hardest one to build. Everything is tight, everything is wet, and every mistake is permanent once the tile goes on. It is also the room most likely to have been built badly by whoever came before.
We take a bathroom down to the studs, rebuild the substrate, waterproof it to current standard, and tile it so the lines are straight and the transitions land where they should. Then you get it back, on the day we said.
Real projects, real numbers. Prices are what the client paid, not a marketing range.






Almost every bathroom that fails, fails at the waterproofing. By the time it shows up as a stain on the ceiling below, the repair is not a bathroom. It is a bathroom plus a ceiling plus whatever the water found on the way down.
We build with Schluter and Wedi systems behind every surface that will ever meet water. Wedi is a foam board that costs meaningfully more than cement board and almost no volume remodeler buys it. You can look both brands up, and you can ask any other contractor what they use.
One warranty callback in the history of the business. It was handled.
Down to the studs and subfloor. We find out what is actually behind the wall before we quote the finish work, not after.
Schluter or Wedi, pre-sloped pans, bonded flange drains, and cement board where it belongs.
Large format up to two by four foot slab, mosaic, hex, herringbone, patterned. Leveling clips on every tile so there is not one lippage edge to catch a toe.
Vanities, tubs, rainheads, body sprays, framed and frameless glass, niches sized to the bottles you actually own.
Fans, recessed cans, sconces, LED mirrors, and enough outlets that nobody unplugs the dryer to charge a toothbrush.
Paint, trim, hardware, caulk lines, and a wipe down. You walk in to a finished room, not a punch list.
Anyone can make a bathroom look good in a photograph taken the day it finishes. These are the details that still look right in year five.






Most full bathroom remodels run $20,000 to $35,000 depending on size, tile, and fixtures. Smaller bathrooms start around $15,000. A recent Tucker bath and shower, demoed to the studs and rebuilt, came in at $15,000. A Brookhaven custom build with slab walls and a floating vanity was $35,000.
A smaller full bath takes about a week. A large custom build runs three to four weeks. You get a start date and a finish date in writing, not a range.
Schluter and Wedi systems behind every surface that will ever meet water. Most bathrooms in Atlanta are still built on green board, which is why they fail at year eight, behind the tile where nobody can see it coming.
A detailed in-person estimate is $75, or $150 for larger and more complex projects. If you hire us, that fee comes off your invoice. It is a working estimate, not a consultation charge.
Often, yes. If the original tile is still made, or there is a close enough match, we can blend new into old so a repair does not announce itself. On a Buckhead condo we rebuilt the whole wet area and tied it into the existing tile.
Erich Ingram walks your bathroom, quotes it, and is on the job from demo to the final wipe down. He sets the tile and the waterproofing himself.
Answer five questions and get a real range before anyone calls you back.
Based off Peachtree Industrial in DeKalb County, working across metro Atlanta.
Related: tub-to-shower conversions, tile installation, and what it costs.