Finished Buckhead condo shower with new tile blended into the existing floor
Home › Bathroom Remodeling › Buckhead

Bathroom Remodeling in Buckhead

Condo bathrooms and mid century ranches, including a Buckhead condo shower rebuilt to the studs for $24,000. Full remodels land between $20,000 and $35,000.

Buckhead

A condo bathroom is a different job from a house.

Half the bathroom work in Buckhead happens above the tenth floor, and a high rise changes almost everything about how the job gets built. There is a building engineer to clear the scope with. There is a window for shutting off the riser, and it is not always the window you wanted. Material comes up a freight elevator on a schedule somebody else sets, demo debris goes down the same way, and there are hours outside which you cannot make noise.

None of that is difficult. It is just the part that turns a three week job into a seven week job when the contractor has not done it before and finds out about the elevator reservation on day one.

The rest of Buckhead is mid century ranches and newer builds off the main corridors, which is ordinary residential work. Same waterproofing standard either way.

$20,000 to $35,000Most full remodels
From $15,000Smaller bathrooms
1 to 4 weeksTypical duration
3 yearsWorkmanship warranty
Buckhead job

A condo shower taken back to the studs.

Complete demo of the wet area, rebuilt and waterproofed, with the new tile blended into the floor that was staying. $24,000. Drag the handle to see what it looked like before.

Finished Buckhead condo shower with new tile blended into the existing floorDated Buckhead condo shower before demolitionBeforeAfter

Buckhead condo shower

Wet area rebuilt to the studs, new tile blended into the existing floor · $24,000
Calacatta primary bath with slab walls and barrel door shower
Calacatta primary bathSlab walls and floor, barrel door shower, hex mosaic pan
Brookhaven custom bath with slab walls and floating vanity
Brookhaven custom bathFull custom build, slab walls, floating vanity · 1 month · $35,000
Hex mosaic shower pan cut clean at the curb and sloped to the drain
Hex mosaic panSet tight, cut clean at the curb, sloped properly to the drain
Why bathrooms fail

In a high rise, the waterproofing is not only your problem.

A shower that fails in a house damages your ceiling. A shower that fails on the fourteenth floor damages the unit below yours, and that conversation involves your HOA and two insurers.

Every wall and the pan get a bonded membrane, the pan is pre sloped, and the drain is bonded to the membrane rather than sitting next to it. We build with Schluter and Wedi. Building engineers tend to recognise both, which makes scope approval faster.

One warranty callback in the history of the business. It was handled.

Water stained ceiling below a shower that failed at the waterproofing layer
Orange Schluter KERDI waterproofing membrane installed on shower walls Shower walls set with leveling clips, pan taped and protected
Top: the ceiling under a shower that failed at the waterproofing. Below left: Schluter KERDI membrane going on before any tile. Below right: walls set with leveling clips, pan taped and protected.
Questions

Buckhead, answered.

Do you work in Buckhead high rises?

Yes. The condo shower on this page was a Buckhead building. We work with the building engineer on scope, riser shut off windows, freight elevator booking and permitted work hours before demo starts.

Will my HOA need paperwork?

Most buildings want a written scope of work before they release the freight elevator, and each management office has its own paperwork. Tell us the building early so we know what yours requires before demo day rather than on the morning of.

Can you blend new tile into a floor I am keeping?

Yes, and the Buckhead condo on this page is exactly that. It is harder than replacing everything, because the new work has to meet the old at the same height and the transition has to look deliberate rather than patched.

What does a Buckhead bathroom remodel cost?

The condo shower on this page was $24,000. Most full remodels land between $20,000 and $35,000, and smaller bathrooms start around $15,000. High rise logistics can add time more than they add cost.

Send a photo of the bathroom.

Fastest way to get a real number. Text a picture and what you want changed, and you get a straight answer back.